某开裂楼板加固后荷载试验分析.docx 立即下载
2024-12-06
约3千字
约2页
0
10KB
举报 版权申诉
预览加载中,请您耐心等待几秒...

某开裂楼板加固后荷载试验分析.docx

某开裂楼板加固后荷载试验分析.docx

预览

在线预览结束,喜欢就下载吧,查找使用更方便

5 金币

下载文档

如果您无法下载资料,请参考说明:

1、部分资料下载需要金币,请确保您的账户上有足够的金币

2、已购买过的文档,再次下载不重复扣费

3、资料包下载后请先用软件解压,在使用对应软件打开

某开裂楼板加固后荷载试验分析
Introduction
Buildingstructuresarecrucialinurbandevelopmentsandaredesignedtowithstandtheloadsandstressesexertedonthem.Buildingsareexpectedtobesafe,stable,andabletowithstandenvironmentalforcesandhumanactivities.However,duetochangesinusage,age,andmaintenance,structuralproblemssuchascrackingandexcessivedeflectioncanoccur,whichmaycompromisethebuilding'sintegrity.Therefore,inthispaper,wewilldiscusstheanalyticalresultsofaloadtestonareinforcedfloorslabthathadcracked.
Background
Theslabinquestionwasalevelslabandwasexperiencingexcessivedeflection,inducingsevereverticalcracks.Visualinspectionandpreliminarymeasurementssuggestedthatthecausewasinsufficientconcreteslabthickness,whichledtooverloading.Therefore,aseriesofloadtestingwasundertakentoevaluatethestrength,stiffness,anddurabilityoftheslabandtoidentifyanypotentialremedialworks.Theloadtestwascarriedoutusingastandardtestproceduretosimulatedifferentloadingconditionsandmeasurethedeflection,strain,andload.
TestProcedure
Todeterminetheloadingcapacityoftheslab,astep-by-stepprogressiveloadingtestwascarriedout.Theloadwasappliedinincrementsof1.5kN/m²usingahydraulicjackandmeasuredusingaloadcell.Thereadingswererecordedatintervalsof2minutesforatotalof10minutesforeachloadincrement.Aftereachloadincrement,thedeflectionwasmeasuredusingadigitallevelgauge.Theloadwasapplieduntilthedesiredloadwasachieved,orthedeflectionexceededtheacceptedlimit.
ResultsandAnalysis
Theinitialdeflectionunderself-weightwasmeasured,anditwasfoundthatexcessivedeflectionwasobserved,whichwasbeyondtheacceptablelimit.Theinitialdeflectionwas12.5mm,whichwashigherthantheallowablelimitof10mm.Thefirstloadof1.5kN/m²wasapplied,andthedeflectionincreasedto13.5mm,whichwasstillhigherthanthepermissiblelimit.Astheloadwasincreased,thedeflectionalsoincreased,andat20kN/m²,thedeflectionwas98mm,whichwasbeyondtheacceptablelimitandwasconsideredafailurepoint.
Thestrainandloaddatawereanalyzedtodeterminethestrength,stiffness,andductilityoftheslab.Figure1showstheload-deflectioncur
查看更多
单篇购买
VIP会员(1亿+VIP文档免费下)

扫码即表示接受《下载须知》

某开裂楼板加固后荷载试验分析

文档大小:10KB

限时特价:扫码查看

• 请登录后再进行扫码购买
• 使用微信/支付宝扫码注册及付费下载,详阅 用户协议 隐私政策
• 如已在其他页面进行付款,请刷新当前页面重试
• 付费购买成功后,此文档可永久免费下载
全场最划算
12个月
199.0
¥360.0
限时特惠
3个月
69.9
¥90.0
新人专享
1个月
19.9
¥30.0
24个月
398.0
¥720.0
6个月会员
139.9
¥180.0

6亿VIP文档任选,共次下载特权。

已优惠

微信/支付宝扫码完成支付,可开具发票

VIP尽享专属权益

VIP文档免费下载

赠送VIP文档免费下载次数

阅读免打扰

去除文档详情页间广告

专属身份标识

尊贵的VIP专属身份标识

高级客服

一对一高级客服服务

多端互通

电脑端/手机端权益通用